Technical

Download the technical specification


Please order your Maritime Pine floorboards at least 3 weeks before you are ready to lay the floor



When you receive your timber:

  • Unwrap the wood from the protective packaging immediately.

  • Store the wood in the room you plan to lay the floor in.

  • This room must be totally DRY and the heat should be very low.

  • Every few days, 'shuffle' the planks.

  • Leave the wood for at least two weeks like this before laying.

  • Follow laying instructions as given with each pack.

  • Introduce heat VERY gradually.



  • Wood is a living, breathing organism - like a human. It does not like to be subjected to extremes of temperature, and will not tolerate damp.

    Please download laying instructions from here.

Tecnical Specification OAK

download details

Laying oak

Download details here